Gallery
In Branxton, our team effectively handled a large shed slab preparation. SGH removed and levelling approximately 200 Tonnes of material including large deposits of rock.
In Greta, our skilled team executed a thorough site operation involving precise cutting and leveling. Approximately 150 tonnes of material were removed, leaving the site perfectly prepared for turf underlay.
In Lambton, the SGH team removed, extended, and replaced the retaining wall, transforming it into a perfect solution for the parking area, ensuring enhanced functionality and structural reliability.
Extension and Levelling
Dirt added and levelled created room for addition functional space.
Top Layer Strip
Cleaning up unwanted overgrown grassed creating the foundation for a fresh and level backyard